G.O. Bond Road: Montreal Loop

Project Manager: Gillie Lopez
Office Phone: (505) 891-5049
E-Mail: glopez@rrnm.gov
Contract Company: TLC Plumbing and Utility
Cost: $  579,195.38
Stage: Construction
Schedule: June 2018 - September 2018
Montreal Loop  GO 2018
The rehabilitation of Montreal Loop from Enchanted Hills Boulevard to Enchanted Hills Boulevard includes replacement of non-compliant American with Disabilities Act (ADA) curb ramps as well as improvements to roadway pavement. Montreal Loop's top 2” of asphalt will be milled, then cracks greater than 2” will be patch, and the cracks under 2” will be sealed and then repaved. Areas identified as having poor subgrade will require the excavation of unsuitable material, replacement with suitable borrow, and subgrade preparation. The Contractor will replace broken curb and gutter (as identified in the plans), striping, and add collars for all utilities shown.

Additional Information:


Status Log:

  • May 2018: Presented to Governing Body for Advice and Consent.
Adobe Disclaimer: Reading the PDF documents provided on this site requires the Adobe Acrobat Reader, available for free from Adobe. Adobe, the Adobe logo, Acrobat, and the Acrobat logo are trademarks of Adobe Systems Incorporated.