G.O. Bond Road: Rockaway Boulevard

Project Manager: Bill Ladd
Office Phone: (505) 891-5032
E-Mail: bladd@rrnm.gov
Contract Company: Franklin's Earthmoving
Cost: $ 2,816,046.31
Stage: Construction
Schedule: TBD
Rockaway1
The Rockaway Boulevard Government Obligation (GO) Bond project will fully reconstruct Rockaway Boulevard NE to a divided two way turn lane, replace damaged street and median curb and gutter, replace damaged sidewalks, design American with Disabilities Act (ADA) compliant curb ramps, and the replace the existing potable water line from Northern Boulevard to NM 528.

Additional Information:


Status Log:

  • October 2018:  Project has been advertised for Bid.
  • September 2018: Finalizing the design.
  • April 2018: Requests for Proposal have been submitted for review.  A Design Consultant will be picked from the proposals.
Adobe Disclaimer: Reading the PDF documents provided on this site requires the Adobe Acrobat Reader, available for free from Adobe. Adobe, the Adobe logo, Acrobat, and the Acrobat logo are trademarks of Adobe Systems Incorporated.