Villa Verde Drive and Dolores Hidalgo Drive Sewer Line Replacement Project

Project Manager: Bill Ladd
Office Phone: (505) 891-5032
Contract Company: TLC Plumbing and Utility
Cost: $  400,156.00
Stage: Construction
Schedule: February 2018 - April 2018
The Villa Verde Drive and Dolores Hidalgo Drive Sewer Line Replacement Project will replacement of approximately 1,000 linear feet of existing 8 inch and 10 inch gravity sanitary sewer line on Villa Verde Drive between Sabana Grande Avenue and Dolores Hidalgo drive, as well as, on Dolores Hidalgo Drive between Villa Verde Drive and Palmas Altas Drive. The work will include replacing the existing sewer line using pipe lining methods, repairing one existing drop manhole connection, rehabilitating 4 existing manholes, and replacing 14 service connections.  Closed Circuit Television (CCTV) inspection of the existing piping and sewage by pass pumping will also occur during the project.  Paved street surfaces dug-up during construction will be repaired to the existing grade upon completion of the project.  Dolores Hidalgo Drive may receive a full depth pavement section replacement between the existing curb and gutter in construction areas.

Additional Information:

  • Affected residents may experience times during construction that will result in no sanitary sewer service.  Affected residents will be notified prior to service disruption.

Status Log:

Click here to add lead-in text.
  • February 2018:  On 2/26/18 removals of the asphalt on Dolores Hidalgo will begin starting the repaving process. This will continue through the 3/2/18. Full access to these residences will be available during the repaving.
  • January 2018:  Notice to Proceed for the project is February 5, 2018.