Rivers Edge Water Line Replacement

Project Manager: Leila Momezadeh
Office Phone:  (505) 891-5048
Email:  lmomenzadeh@rrnm.gov
Contract Company: New Concepts Inc.
Cost: $ 737,517.07
Stage:  Construction
Schedule: May 2017 - September 2017
Rivers Edge Water Line Replacement
The project includes water line replacement and roadway reconstruction of Rivers Edge Drive, Gila River Road, Silver Creek Drive, and Butte Way. A new 8” water line will be installed including new copper services to the residents. The road work consists of milling the existing pavement surface, subgrade preparation, the installation of 4" of base course, and 3" of asphalt.

Water Shut-off Notification:


A water shut-off has been scheduled in order to connect the newly installed water line on Silver Creek Drive to the existing main line on Riverside Drive. This water shut-off will occur Tuesday night on 6/20/17 between the hours of 11:00 pm to 4:00 am. The areas affected by this shut-off are the residents on the streets as followed: Silver Creek Drive, Butte Way, Gila River Road, and Rivers Edge Drive. A copy of the original notification letter can be viewed here.
Your patience and cooperation is greatly appreciated. 

Status Log:


  • May 2017: The Pre-Construction meeting was held on May 3, 2017. Construction will begin on May 15, 2017.
  • April 2017: Governing Body Advice and Consent.