Water Booster Station at Tank 8 Site

Project Manager: Gillie Lopez
Office Phone: (505) 891-5049
Contract Company: TLC Plumbing and Utility
Cost: $ 2,953,456.88
Stage: Construction
Schedule: May 2016 - March 2017
WaterBoosterStation_Page_2.jpg
Construction of a new booster station will transfer water from Tank 8 located at Northern Boulevard and 2nd Street to Tank 13 located at Northern Boulevard and Encino Road. Work will include the removal of an existing temporary booster station, construction of a new booster station, a pressure relief line, electrical and mechanical yards, surge tank and flow meter vault, installation of the Supervisory Control and Data Acquisition system, and construction of 13,900 linear feet of 16 inch transmission line from the intersection of Northern Boulevard and 2nd Street to the intersection of Northern Boulevard and 21st Street.


Additional Information:


Status Log:


  • February 2017: The Contractor is working on installing the final components. Testing of the site will begin next month.

  • August 2016: The Contractor has installed another 13,000 feet of 16 inch pipe and has begun work on the booster station.

  • July 2016: The Contractor has installed 4,000 feet of 16 inch pipe.

  • May 2016: Notice to Proceed for Design was given to TLC Plumbing and Utility.

Adobe Disclaimer: Reading the PDF documents provided on this site requires the Adobe Acrobat Reader, available for free from Adobe. Adobe, the Adobe logo, Acrobat, and the Acrobat logo are trademarks of Adobe Systems Incorporated.