Current Road Work

This page contains information on lane restrictions that may be present during road construction in the City of Rio Rancho. Information will be updated on this page as it becomes available. Motorists traveling within construction zones are urged to drive with caution and observe traffic control devices. Remember to always wear your seat belt and drive the speed limit.
Neighborhood Streets Improvement Project:
Work for the Neighborhood Streets Improvement Project will be typically from 7:00 a.m - 5:00 p.m., Monday-Friday, and weekends and evening hours as needed. Please click on the project title for estimate starting dates for crack patching and crack sealing on specific roads.

Unser Boulevard:

There will be crews out landscaping the median of Unser Boulevard between Westside Boulevard and Cabezon Boulevard from February 12 - March 2, 2018.  While work is taking place, the inside lanes will be closed daily in both directions from 9:00 a.m. - 3:00 p.m.
US 550:
This project is managed by the New Mexico Department of Transportation (NMDOT).  Construction is from September 22, 2017 - October 2018, Monday-Friday, 7:00 a.m. to 5:00 p.m..  Construction Crews will begin gearing up for work daily at 6:00 a.m. - 6:30 a.m.
Villa Verde Drive and Dolores Hidalgo Drive:
Construction for the Villa Verde Drive and Dolores Hidalgo Drive Sewer Line Replacement project will be from February 5 - February 26, 2018, Monday-Friday, 7:00 a.m. to 5:00 p.m.  There may be temporary lane closures during construction.  There will be various road closures for this project as indicated below:
Water Main Breaks:
  • Please click on the title for more details.
Adobe Disclaimer: Reading the PDF documents provided on this site requires the Adobe Acrobat Reader, available for free from Adobe. Adobe, the Adobe logo, Acrobat, and the Acrobat logo are trademarks of Adobe Systems Incorporated.