Capital Improvements Projects (CIP)
Capital Projects are managed by the Capital Improvements Section.  Listed below are the current major projects within the Engineering Division.  Click the title of the project if you would like additional detailed information.

Americans with Disabilities Act (ADA) Plan

Advanced Water Treatment Facility Phase 3
  • Stage: Construction
  • Termini: Stapleton Avenue
  • Overview of Project: Equip the Advanced Water Treatment Facility to begin direct injection into the aquifer.
  • Time Frame:
    • Construction: April 25, 2016 - May 2017

Broadmoor Boulevard
  • Stage: Construction
  • Termini: From Northern Boulevard to Paseo Del Volcan
  • Overview of Project: Roadway extension, traffic signal installation, and overlay on existing portions of the roadway.
  • Time Frame:
    • Construction: May to December 2016.

Booster Station at Tank 8 Site
  • Stage: Construction
  • Termini: From Northern Boulevard and 2nd Street to Northern Boulevard and 21st Street
  • Overview of Project: Construction of a new booster station at the Tank 8 site.
  • Time Frame:
    • Construction: Spring 2016

Grande Boulevard and Ridgecrest Drive
  • Stage: Construction
  • Termini: From Sara Road to NM 528, and From High Resort Boulevard to NM 528
  • Overview of Project: Crack sealing, crack patching, and striping.
  • Time Frame:
    • Construction: May 31, 2016 - July 15, 2016

Idalia Road
  • Stage: Construction
  • Termini: From Iris Road to NM 528
  • Overview of Project: Roadway improvements.
  • Time Frame:
    • Construction: November 16, 2015 - September 16, 2016

Lift Station 10
  • Stage: Construction
  • Termini: From Northwest Corner of Southern Blvd. and NM 528 to Pinehurst Road and Lost Tree Road.
  • Overview of Project: Relocation of Lift Station.
  • Time Frame:
    • Construction: September 2015 - May 2016

Southern Boulevard - Phase I

  • Stage: Final Design 
  • Termini: From NM 528 to Golf Course Road
  • Overview of Project: Design for future road improvements.
  • Time Frame:
    • Final Design Starts: May 2016
    • Construction Starts: Federal Fiscal Year 2018

Unser Boulevard Phase 2B

  • Stage: Right-of-Way Acquisition
  • Termini: From Farol Road to Paseo Del Volcan
  • Overview of Project:Preparation for future road improvements.
  • Time Frame:
    • Current Right-of-Way Acquisition will be completed by end of September 2015.
    • Right-of-Way Acquisition will continue as budget allows.

Water Service Line Replacement Phase 4

  • Stage: Construction
  • Termini: Various; Please click title to see list of roads.
  • Overview of Project:Replacement of existing polyethylene water service lines with copper water service lines.
  • Time Frame:
    • Phase IV Expected to Start: April 5, 2016.

Other Agency Projects:

NM 528 (Pat D’Arco Highway) Phase 2

Separation Image.png

Links:

Department of Public Works   Engineering Division
2009 Road Improvement Bond   Capital Improvement Projects (CIP)
Department of Public Works FAQ   Capital Improvement Projects (CIP) Right-of-Way Permit
Department of Public Works Forms   Design Criteria and Standard Details
    Downloadable Maps
Streets & Right-of-Way Division
  GIS Data Download
Dirt Road Maintenance
  Map Application Gallery
Graffiti Reporting
   Special Assessment District (SAD) Information
Pavement Maintenance
  Traffic Update
Road Sweeping
 
Snow Removal
  Land Coordinator
Weeds, Litter, and Drains Maintenance
  Property Acquisition Process


Adobe Disclaimer: Reading the PDF documents provided on this site requires the Adobe Acrobat Reader, available for free from Adobe.  Adobe, the Adobe logo, Acrobat, and the Acrobat logo are trademarks of Adobe Systems Incorporated.